- Donor: WWF-Vietnam
- Implementing partner: VNCPC
- Duration: 11/2023 – 04/2024
- Sector: Denim fabric
- Location: Namdinh Province
- Contact: Le Van Tung
- Email: [email protected]
- Tel: (84-24) 3868 4849 – ext 34
Overall objective
The study aims to analyse and propose a plan for improving and upgrading the existing wastewater recycling system to meet the business’s water supply requirements for production.
Activities
Main activities of the assignment
- Carry out feasibility studies for the wastewater recycling project, including:
Collect relevant data;
Analyze and modelling;
Develop concept design for the recycling wastewater unit;
Call for and evaluate quotations from vendors; and
Compile the feasibility study report. - Provide technical support based on the feasibility studies for implementation of the wastewater recycling system; and
- Providing distance technical support (via phone/email) to the company’s queries about the report developed.
Activities in 2023:
- Completed data collection and analysis; and
- Prepared a feasibility study report on a wastewater recycling system.